The study was released on 29 August 2017 at the New Pilbara Economic Development conference in Perth by the Western Australian Minister for Regional Development Hon Alannah MacTiernan. The publication includes reference to the Gobitec and Asian Super Grid which was a joint study prepared by Fraunhofer Institute for Systems and Innovation Research and the Energy Charter Secretariat.
The key findings of the publication were: It is technically feasible to build a gigawatt scale facility in the Pilbara and deliver the energy generated, via a HVDC cable to Indonesia; Solar energy generation, storage and HVDC costs are declining and if present trends continue, the commercial case for connection to Indonesia will be well established within 5 to 10 years.
Click here to view the full publication